wattsc

The steam generator is made up of one or more pressure vessels that have a variable number of electrical resistors on board. Such a configuration allows the generator to modulate steam production and absorbed power.
Installation of the generator is as fast as it is simple because only 4 connections are needed: electrical power supply, steam supply, drain and water inlet. The water supply can be connected directly to the water network to a condensate tank.
INTEGRAL MAINTENANCE

Complete boiler maintenance:
- Change of gaskets
- Level cleaning
- Security tests
- Burner cleaning and adjustment
- Combustion analysis, etc.
Type of inspections A-B-C
With authorized control body included
Detection of breakdowns
in less than 48 hours
2 hours free visits for breakdowns
80% of breakdowns are solved in 2 hours!
Telephone assistance for breakdowns
7 days / week, business hours
Preventive visit every 6 months
(cleaning, checking and adjusting the burner)
15% of discount in spare parts
Large quantity of stock and materials





